Airport
  /   Investment Portfolio  /   Current Investment  /   Airport

New Systems AM

Kharkiv International Airport will be remodeled in accordance to the business plan created and worked out by the company Airport Consulting Vienna.

DCH will invest $ 205 mln in the project.

Element of airport complex Currently After Reconstruction
Airfield The airport includes an artificially-made landing strip of 2224 х 50 (80) m with a surface loading capacity of PCN – 40. The landing strip will be lengthened to 2 470 m with an increased surface landing capacity of up to PCN - 45-60.
Servicing aerial vehicles At the airfield airplanes with АСN index of less than 40 can be exploited without restrictions. Other aerial vehicles (А-319, А-320, DS-9, etc.) under a certain weight have limits on the number of takeoff and landing operations. Increased surface loading capacity (PCN) will allow Airbus A-320 and Boeing B-737 airplanes to land and take off.
Air terminal The airport includes a passenger terminal with a handling capacity of 100 passengers/hour; total area including accessory pavilions is 2,000 sqm. In 2007, the passenger flow was 129,000 passengers. A new terminal wii be built with a total area of 20,000 sqm for servicing 850,000 passengers in 2011.
Service for VIP passengers and official delegations Demand for VIP passenger services is currently not satisfied. The existing air terminal is to be reconstructed to create a VIP room and space for accepting official delegations.
Hotel facilities Hotel does not comply with modern requirements. It is planned to build a new hotel with 150 rooms.
Fuel servicing complex The existing fuel servicing complex of the airport is not capable of providing fuel-servicing for significant numbers of aerial vehicles. To increase the effectiveness of the complex, the park capacity will be modernized, and if necessary the deliver fuel pipe connecting the railway and the depots of airplanes will be renovated.
Parking There is a temporary parking lot near the airport for 100 -120 cars. To increase the capacity of the parking lot, the area outside the airport is to be expanded, and transport junctions are to be created. A parking garage for 180 cars will be built.